Scrivener Dam Dissipator Project
Latest updates
4 April 2025
The NCA is lowering the water level of Lake Burley Griffin to support construction works for the Scrivener Dam Dissipator Strengthening Project.
The water level will be lowered by up to 250 millimetres with an additional drawdown of up to 250mm scheduled to take place in May, if required.
The water level will remain up to 500mm below normal levels until construction works for the Scrivener Dam Dissipator Strengthening Project are completed.